Evidence pages

Evidence page · ormondeconstruction.ie · checked 2026-10-27

Ormonde Construction Ltd: its public claims,
and the evidence behind them.

This page lists the checkable claims ormondeconstruction.ie makes on its own public pages, where each claim is made, and what the company itself has published that backs it. It was checked on 2026-10-27 by OneDroid, a third party, from the company's own public sources only: 75 claims, 5 evidenced, 3 contradicted, 67 with no evidence published. Nothing on this page says a claim is true or false. Every reference points into a source whose sha256 as fetched is listed at the end of the page, so anyone can fetch the same bytes and compare. The same page as Markdown: /evidence/ormondeconstruction.ie.md.

How to read this page

VerdictMeaningCount
EVIDENCEDan artefact on the company's own surfaces would be false if the claim were5
CONTRADICTEDthe company's own surfaces disagree with the claim; both sides are referenced3
NO EVIDENCE PUBLISHEDthe claim is stated; nothing beyond the statement backs it in the sources checked67

These are the only three verdicts. They are statements about the company's own published sources as fetched on 2026-10-27, not about the world. A claim with no evidence published may well be true; the page says only that the company has not shown it. A contradicted claim may have a reading that reconciles the two sources; where the reviewers saw one, the note says so. Each claim has an id (C-001, C-002, ...) that is also its anchor on this page. The method and the rules for every page are on the evidence pages index.

Limits

Same sources only: the reviewers read what the company published and nothing else. They did not test the product, interview anyone or use outside records. Every verdict is about the sources as fetched on 2026-10-27; a page can change after that. One run is a sample of a moving site: a claim not listed may be right or wrong. The reviewers are AI agents run by OneDroid, checked by hand on a sample; OneDroid is not independent of its own method.

Right of reply

If you are Ormonde Construction Ltd and a line is wrong, write to michal@onedroid.ai naming the claim id. Your answer is shown beside the verdict, in full and unedited, with its date, and does not replace the verdict. If you publish new evidence, the claim is checked again from the new sources, with a new date and new fingerprints, and the verdict changes when the evidence supports it. A wrong quote, URL or fingerprint is corrected on request and listed in the change log.

Change log

2026-10-27: first run.

Contradicted (3)

IdClaim, as madeMade atBoth sides
C-001Ormonde Construction Ltd has been in operation since 2001.ormondeconstruction.ie/ (Welcome To Ormonde Construction)
ormondeconstruction.ie/home/ (Welcome To Ormonde Construction / Crokers Hill slide)
Home page says 'in operation since 2001' but the history timeline's company entry is headed '2002' with 'Ormonde Construction Ltd ... in operation for over 21 years'. Confidence low: 2002 can be read as a first-trading or incorporation marker rather than the founding year, so the pages may agree.
text/history.txt#L25-L27
text/home.txt#L58
text/index.txt#L49
Reviewer's note: Reconcilable reading: the history timeline's 2002 entry may mark first trading or incorporation rather than the founding year; the site does not say which. A one-year gap, on the company's own pages.
C-002Ormonde Construction was established in 2001 (based in Kilkenny, in the South East).ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/john/ (Managing Director bio page: set up Ormonde Construction Ltd in 2001)
About and the Managing Director bio both say 2001 (set up in 2001), while the history timeline dates the company entry 2002. Confidence low: the 2002 entry may mark a different event (e.g. first full year); the site never says which.
text/about-company.txt#L26
text/john.txt#L26
text/history.txt#L25-L27
Reviewer's note: Same disagreement as C-001: About and the Managing Director's page say 2001, the history timeline heads the company entry 2002.
C-022Commercial Director has over 30 years' experience as a Quantity Surveyor and joined Ormonde in 2015.ormondeconstruction.ie/paddy/ (Commercial Director bio page)The bio page and /team/ give the title Commercial Director, but the live /team-2/ page gives the same person the title Commercial Manager. Confidence medium: /team-2/ may be an older duplicate page, but it is live at HTTP 200 and modified 2024-09-20.
text/paddy.txt#L26 ('Commercial Director ... joining Ormonde in 2015')
text/team.txt#L25-L26 ('Commercial Director')
text/team-2.txt#L25-L26 ('Commercial Manager')

Evidenced (5)

IdClaim, as madeMade atArtefact
C-004History timeline dates the company entry at 2002 ('2002 Ormonde Construction Ltd'), while other pages say 2001.ormondeconstruction.ie/history/ (timeline first entry)text/history.txt#L25-L27
sources/history.html#L1061 (ue-title/ue-description of first timeline entry)
The history page itself is the fact: first timeline entry is numbered 2002 over the Ormonde Construction Ltd text, which would be false if the claim were false.
Reviewer's note: This row records the disagreement itself; the history page shows it (first timeline entry headed 2002, three other pages say 2001). The contradiction is scored on C-001 and C-002.
C-008Tagline: 'Built on Experience'.ormondeconstruction.ie/ (JSON-LD WebSite description / hero heading)sources/index.html#L23 (JSON-LD WebSite description 'Built on Experience')
sources/index.html#L1291 (hero h3 'Built on Experience')
text/home.txt#L46
Machine-readable WebSite description and visible heading both carry the tagline; the claim is about what the site says so the page content is the fact.
C-026The team page lists a Managing Director, Contracts Director, Commercial Director and Commercial Manager.ormondeconstruction.ie/team-2/ (role titles)
ormondeconstruction.ie/team/ (Commercial Director)
text/team-2.txt#L25-L33
text/team.txt#L25-L33
https://ormondeconstruction.ie/team-2/#HTTP 200 (checks-for-prompt.md)
The team pages are the fact: team-2 lists the Commercial Manager title and team lists Commercial Director, alongside Managing Director and Contracts Director; PARTIAL in that the two pages differ on the third title.
Reviewer's note: The reviewer corrected the lister: each team page lists three roles, not four; the two live team pages differ on one title (Commercial Director on /team/, Commercial Manager on /team-2/), scored on C-022.
C-058Thomastown social and affordable housing: 42 units on a 1.24 hectare site at Abbeyhill, Ladywell Street, for Kilkenny County Council under Housing for All; Ormonde appointed contractor; expected completion early 2026.ormondeconstruction.ie/new-social-and-affordable-housing-scheme-in-kilkenny/ (article body)sources/new-social-and-affordable-housing-scheme-in-kilkenny.html#L1031 (quoted statement attributed to the council's chief executive naming Ormonde)
text/new-social-and-affordable-housing-scheme-in-kilkenny.txt#L25-L33
sources/post-sitemap.xml#L50 (lastmod 2024-10-08T21:13:38+00:00)
PARTIAL: a dated news post carries a named-role client quotation welcoming Ormonde's appointment, which backs the appointment; the 42 units, 1.24 ha and early 2026 completion are only the article's own text, and the quote itself is unverified on a third-party surface.
C-075Site robots.txt allows all crawlers and lists sitemap_index.xml.ormondeconstruction.ie/robots.txt (whole file)https://ormondeconstruction.ie/robots.txt#HTTP 200, live GET 2026-10-27; body 'User-agent: *', 'Disallow:', 'Sitemap: https://ormondeconstruction.ie/sitemap_index.xml'
sources/robots.txt#L3-L6
https://ormondeconstruction.ie/sitemap_index.xml#HTTP 200 content-type text/xml, live GET 2026-10-27
The robots.txt file is itself the fact (empty Disallow for all agents, sitemap line) and the sitemap index it names answers 200.

No evidence published (67)

IdClaim, as madeMade atWhat would close it
C-003Ormonde Construction Ltd ... has been in operation for over 21 years.ormondeconstruction.ie/history/ (2002 timeline entry (og:description))Rolling 'over 21 years' text on the history page and its meta description; no dated artefact beyond the sentence, and the live fetch timed out in the check run.
C-005Ormonde Construction Ltd is based in the South East of Ireland.ormondeconstruction.ie/ (Welcome To Ormonde Construction)
ormondeconstruction.ie/history/ (2002 entry)
Location statement repeated on two pages; no address-bearing artefact tying the claim beyond the sentences.
C-006Registered/office address: Unit 20, Danville Business Park, Kilkenny, R95 K282; tel +353 (0) 56 778 6940; info@ormondeconstruction.ie.ormondeconstruction.ie/ (footer Contact Details)
ormondeconstruction.ie/contact/ (Our Location)
Address, phone and email appear in the footer and contact page; no registry, Companies Office extract or map listing on the company's surfaces to back registered-office status. Live contact page changed since the saved copy per checks.
C-007The company has a LinkedIn page (Ormonde Construction Limited).ormondeconstruction.ie/ (JSON-LD Organization sameAs / footer link)The site only links to a LinkedIn URL; existence of the page itself is on a third-party surface outside the audit.
C-009The company has completed projects in both the public and private sector.ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/history/ (2020 entry: accumulated extensive experience in both the public and private sector)
Statement of public and private sector work only; the 2020 client list it refers to is absent from the saved page.
C-010Sectors served: Commercial/retail, Industrial, Primary/Nursing care, Educational and Residential, including Design and Build.ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/ (sector list: Commercial/Retail/Fitout, Healthcare, Residential, Industrial, Design and Build, Education)
Sector list on two pages; sector pages exist but list the company's own projects, not independent confirmation.
C-011Sectors also include food and beverage, healthcare, sports and leisure.ormondeconstruction.ie/quality-in-quantity/ (Moving up paragraph)Sentence in a staff profile article; no project pages for food and beverage or sport/leisure beyond Nowlan Park's own page restating itself.
C-012The diversity of projects and client base has been the key in the success of the company.ormondeconstruction.ie/ (Welcome)
ormondeconstruction.ie/history/ (2002 entry)
Self-assessment statement repeated on two pages; a comparison with no data.
C-013Ormonde achieves client objectives within their set financial budgets and timelines.ormondeconstruction.ie/ (Built on Experience / Kilkenny Primary Care slide)
ormondeconstruction.ie/history/ (2006 entry)
Assertion repeated on homepage and history; no budget or programme data per project published.
C-014The company has many repeat clients over the years.ormondeconstruction.ie/history/ (2006 entry: 'our many repeat clients over the years')One sentence on 'many repeat clients'; no named repeat-client list or contract dates shown.
C-015In 2014 the company broadened its client base and type of projects to deliver across new sectors.ormondeconstruction.ie/history/ (2014 entry)One timeline sentence; no dated project pages from 2014 on the site to back the broadened client base.
C-016The company 'successfully completed projects for the following clients among others' (client list, 2020 entry; names not present in extracted text).ormondeconstruction.ie/history/ (2020 entry)Dangling reference: the sentence says 'the following clients' but the list is not present in the saved page; would need the client names or logos.
C-017Company uses local suppliers and sub-contractors and employs locally as much as possible.ormondeconstruction.ie/ (More About Us)Single paragraph on local sourcing; no supplier list or subcontract data published.
C-018Localising the supply chain reduces shipping/storage, emissions and energy usage and supply chain costs.ormondeconstruction.ie/ (More About Us)Generic claim about localised supply chains with no figures or method.
C-019The company has successfully completed over 200 projects (apartment blocks, housing schemes, nursing homes, schools, office blocks, large industrial and warehousing).ormondeconstruction.ie/john/ (Managing Director bio page)'Over 200 projects' in a bio; the projects page shows 21 project cards and no project register or list of 200.
C-020Managing Director has over 30 years' experience in the construction industry and previously worked for two of Ireland's largest construction companies.ormondeconstruction.ie/john/ (Managing Director bio page)Biography statement; no employment history or named prior employers published.
C-021The Managing Director oversees every aspect of projects including procurement, hiring/managing project team and ensuring compliance with building and safety regulations.ormondeconstruction.ie/john/ (Managing Director bio page)Role description in a bio; no process documents or org chart.
C-023The Commercial Director manages the Estimating Department in delivery of tender submissions and has negotiated several significant residential, commercial and primary care centre buildings.ormondeconstruction.ie/paddy/ (bio)Role description; the named building types correspond to project pages but nothing ties the individual to them.
C-024Contracts Director has over 20 years' experience, is degree qualified in Civil and Transportation Engineering, joined in 2005 and was appointed Contracts Director in 2017.ormondeconstruction.ie/richie/ (Contracts Director bio page)Biography statement; no degree certificate or membership listing shown.
C-025Contracts Director is responsible for all site management teams and project delivery compliant with Building and HSEQ requirements.ormondeconstruction.ie/richie/ (bio)Responsibility statement in a bio; no HSEQ system document or certificate.
C-027A quantity surveyor's duties include ensuring compliance with the Building Control Amendment Regulations (BCAR).ormondeconstruction.ie/quality-in-quantity/ (Responsibilities)Duty list in a staff profile article; no compliance document or BCAR assignment certificate.
C-028Ormonde manages every aspect of commercial projects from pre-construction through to completion.ormondeconstruction.ie/commercial/ (Commercial / Retail)Capability statement; no scope document or case study with pre-construction phases.
C-029Ormonde delivers fitout projects and operates 'at scale'.ormondeconstruction.ie/commercial/ (Fitout)Marketing wording ('operate at scale') with no metrics; no fitout project page is named.
C-030Design-build delivery: the company finds it often translates to shorter schedules and lower project costs.ormondeconstruction.ie/design/ (Design and Build)Self-reported tendency with no schedule or cost comparison data.
C-031Ormonde provides design and build services.ormondeconstruction.ie/design/ (Design and Build)
ormondeconstruction.ie/ (sector list)
Design and Build sector page and project cards (Market Square, Droughill) restate the capability; no design-build contract or client confirmation.
C-032Ormonde provides healthcare/primary care facilities with 'highly qualified teams'; healthcare is a key market.ormondeconstruction.ie/healthcare/ (Healthcare)Sector page statement; primary care project pages restate it but no HSE contract document or client statement.
C-033Ormonde provides education facilities, including work in live school environments.ormondeconstruction.ie/education/ (Education)
ormondeconstruction.ie/project-st-gerards/ (live school environment)
ormondeconstruction.ie/project-st-teresians/ (live school environment)
Education page and two project pages restate live-school working; no school or client statement.
C-034Ormonde provides industrial project services including programme management and cost analysis.ormondeconstruction.ie/industrial/ (Industrial)Sector page statement; no programme or cost analysis sample published.
C-035Ormonde provides residential services: project managing large social housing programmes, scheme design and placemaking; development team initiating new schemes.ormondeconstruction.ie/residential/ (Residential)Sector statement; no named social housing programme page apart from a news article on Thomastown housing.
C-036Residential clients can be assured the finished result is delivered on time and budget and to the highest quality (reliable accommodation models).ormondeconstruction.ie/residential/ (second paragraph)Assurance wording with no delivered-on-time or budget data.
C-037Health and safety: tool box talks, safety inductions, training and daily whiteboard meetings are used on projects.ormondeconstruction.ie/healthandsafety/ (Health and Safety)
ormondeconstruction.ie/about-company/ (Health & Safety)
H&S page lists the practices; about page only says safety is at the heart, so the named practices appear on one page only. No safety statement document, inspection record or certificate.
C-038All sites are regularly inspected by the company's H&S team for compliance with company procedures and legislative requirements.ormondeconstruction.ie/healthandsafety/ (Health and Safety)Inspection claim stated once; no inspection records or audit certificate.
C-039Health & safety is at the heart of everything the company does; safety standards are constantly evaluated.ormondeconstruction.ie/about-company/ (Health & Safety)Aspirational wording with no metric or certification.
C-040Committed to providing the necessary resources to eliminate injury and incidents on all projects.ormondeconstruction.ie/healthandsafety/ (Health and Safety)Commitment wording with no incident statistics or certification (e.g. no named safety certificate image).
C-041Core objective: every individual working on Ormonde sites returns home safely and leaves with a sense of wellbeing.ormondeconstruction.ie/project-thomastown-primary-care/ (core values sentence)Values sentence on a project page; no policy document.
C-042Quality objectives and control processes are defined and implemented; each project has a risk management plan (identify, prioritise, contingency, revisit and revise).ormondeconstruction.ie/about-company/ (True Quality)Quality and risk process described in prose; no manual, certification or sample risk plan published.
C-043The company uses the latest software to track changes in a live environment so all parties work on the same consolidated information; CAD is used in design.ormondeconstruction.ie/about-company/ (Technology)Generic technology statement; the software is not named and no artefact shows its use.
C-044Sustainability statement commitments: comply fully with legal requirements, assess environmental impacts and seek to reduce pollution, promote environmental and energy awareness through employee training, work with customers on sensitive choices, monitor progress, communicate policy to stakeholders.ormondeconstruction.ie/sustainability/ (Sustainability Statement)Policy bullets on one page; the Learn More buttons link to '#' so no policy document, plan or certification is available.
C-045Crokers Hill project used eco-friendly materials (recycled or locally sourced), recycling/reuse of construction debris, and regular inspections and training on health and safety.ormondeconstruction.ie/project-crokers/ (body)Project page prose only; no materials schedule, waste records or certification.
C-046Crokers Hill: over 88 housing units.ormondeconstruction.ie/project-crokers/ (intro)
ormondeconstruction.ie/projects/ (Crokers Hill card)
Count stated on project page and card; no unit schedule or planning reference.
Reviewer's note: The project page says 'over 88 housing units' and the residential sector card for the same scheme says 'over 70'. Both are lower bounds, so they can be read to agree; one figure would be better. No unit count beyond the statements is published.
C-047A residential project is described as 'over 70 housing units' (listing on residential page; project not named in extracted text).ormondeconstruction.ie/residential/ (project card)Count appears only as a card sentence; project name is not in the text beyond the card heading and no unit list.
Reviewer's note: The 'over 70 housing units' card is the Crokers Hill scheme; see C-046.
C-048College Park, Callan Road, Kilkenny City: 59 residential units (timber frame, 3 and 4-bed semi-detached and terraced, duplexes, apartments).ormondeconstruction.ie/project-college-park/ (intro)
ormondeconstruction.ie/projects/ (College Park card)
Unit count and construction type on project page and card; no drawings, planning number or client statement.
C-049Castle Oaks: phased development of 77 mixed-tenure residential homes; Breagagh River site constraints; ESB overhead wires rerouted underground.ormondeconstruction.ie/project-castle-oaks/ (intro)Project prose only; no phasing programme, utilities correspondence or client statement.
C-050Castle Oaks next phase launching (upcoming).ormondeconstruction.ie/upcoming-projects/ (Castle Oaks Housing)Single line on the upcoming page; no planning reference or dated announcement.
C-051Droughill Housing: 26 new residences (18 two-storey terraced and 8 single-storey semi-detached), 90 to 100 square metres each.ormondeconstruction.ie/project-droughill/ (intro)
ormondeconstruction.ie/design/ (Droughill card)
Counts and sizes on project page and card; no unit schedule or drawings.
C-052Market Square (Vignoles Gardens): Design and Build contract for 20 elderly houses and apartments incl. renovation of a derelict Protected Structure.ormondeconstruction.ie/project-market-square/ (intro)
ormondeconstruction.ie/design/ (card)
Design and Build project prose; no contract or client statement; the Protected Structure is not tied to a protected-structure register entry on the site.
C-053Walkin Street, Kilkenny City: 27 apartments, community centre, offices, underground car park, 3800m2 floor area, 4-storey over basement.ormondeconstruction.ie/project-walken-street/ (intro)
ormondeconstruction.ie/ (Latest Projects)
Project page and homepage card; no drawings or client confirmation.
C-054Walkin Street development is 'award winning' (award not named).ormondeconstruction.ie/project-walken-street/ (first sentence)Single adjective 'award winning' with no award, body, year or certificate named or shown.
C-055Kilkenny Primary Care: three-storey Primary Health Care centre, 5867m2 floor area, NZEB compliant, turnkey with furniture and fittings.ormondeconstruction.ie/project-kilkenny/ (intro and Security)Floor area and NZEB compliance stated in prose only; no BER, NZEB certificate or client statement.
C-056Thomastown Primary Care Centre: commissioned by the HSE, 3500 square metres, two-storey, Ladys Well St., Thomastown.ormondeconstruction.ie/project-thomastown-primary-care/ (intro)
ormondeconstruction.ie/ (Latest Projects)
HSE commissioning and size stated on the company's pages; no HSE document or tender award linked.
C-057Callan Primary Care: Primary Care Centre and Neighbour Centre in Westcourt, Callan, with 3,000 sq ft GP surgery, fit-out to HSE standards.ormondeconstruction.ie/project-callan-primary-care/ (intro)Project prose only; no HSE fit-out sign-off or client statement.
C-059Planning permission granted by Kilkenny County Council for a new primary care centre on Hebron Road, Kilkenny (89 parking spaces); Hebron Road Primary Care Centre and Housing is listed as upcoming.ormondeconstruction.ie/green-light-for-large-new-primary-care-centre/ (article body)
ormondeconstruction.ie/upcoming-projects/ (list)
News post and upcoming list restate it; no planning reference or council notice linked (council notices are outside this audit).
C-060Upcoming projects: Fethard Primary Care Centre, Thurles Housing, Williamstown Housing, Tullamore Warehouse 12, Thomastown Housing, Hebron Road Primary Care Centre and Housing.ormondeconstruction.ie/upcoming-projects/ (list)Bare list of project names with no dates, clients or planning references.
Reviewer's note: The upcoming-projects list (modified 2025-09-19) still names Thomastown Housing while the company's news item of 8 October 2024 says construction there has started. Read as a stale list rather than a contradiction; the page does not say.
C-061Adamstown community centre: SDZ project, 15 months from planning submission to handover; built in a seven-month programme within budget; Ormonde managed precast works on a design and build basis.ormondeconstruction.ie/project-adamstown/ (Streamline)Programme durations in project prose; no dated milestones, budget or client statement.
C-062Aras Brugha Hostel, Dungarvan: refurbishment, three-storey extension, M&E works; completed March 2019.ormondeconstruction.ie/project-arus-brugha/ (intro and Safety)Completion date stated in prose only; no dated handover document or client statement.
C-063Bergins: 50,000 ft2 warehouse for Bergin Haulage at Purcellsinch Business Park, Kilkenny; 11m clear height; 8m high retaining walls.ormondeconstruction.ie/project-bergins/ (intro)Dimensions and client named in prose; no drawings or client statement.
C-064Meubles: 100,000 sq ft retail showroom over two floors at Smithland's Retail Park, Kilkenny, built while the park stayed operational.ormondeconstruction.ie/project-meubles/ (intro)Size and live-site working in prose; no drawings or client statement.
C-065PRL Logistics Solutions: 30,000 sq ft high-bay warehouse built within a live bonded site.ormondeconstruction.ie/project-prl/ (intro)
ormondeconstruction.ie/industrial/ (PRL card)
Project page and industrial card restate it; no client statement.
C-066Nowlan Park (UPMC Nowlan Park, Kilkenny GAA): new 4,000 all-seated covered stand, roof for Ardan Breathneach, County Board offices refurbishment; stadium fully operational during works.ormondeconstruction.ie/project-nowlan-park/ (intro)
ormondeconstruction.ie/industrial/ (card)
Project prose only; no GAA or county board statement or dated handover.
C-067Gowran Park racecourse (15 minutes from Kilkenny city): demolition of jockeys' weights room and new two-storey weight room building; limestone cladding; handover reported 8 October 2024.ormondeconstruction.ie/project-gowran-park/ (intro)
ormondeconstruction.ie/gowran-park-handover/ (article)
Article text restates the project page; the 8 October 2024 date is only the post's CMS publication metadata, not evidence of when handover occurred.
C-068Taxback: renovation of a three-storey 20,000 sq ft office block, delivered with a five-month completion deadline.ormondeconstruction.ie/project-taxback/ (intro and Minimising)Size and deadline in project prose; no dated handover or client statement.
C-069Powerscourt Distillery and Visitors Centre, Enniskerry, Co. Wicklow: Ormonde was Main Contractor; new 15m distillery building; restoration of 1730 mill house (protected structure).ormondeconstruction.ie/project-powerscourt-distillery/ (intro and Renovation)Main contractor role and building details in prose; no client statement or protected structure record linked.
C-070Church of Oak Distillery (Ballykelly Distillery) near Monasterevin, Co. Kildare: demolition, asbestos removal, site works.ormondeconstruction.ie/project-ballykelly-2/ (intro)
ormondeconstruction.ie/ (Latest Projects)
Project page and homepage card; no client statement.
C-071St. Gerard's Private School, Bray, Co. Wicklow: extension to Junior and Senior schools, fire remediation, all work in a live school with phased handover.ormondeconstruction.ie/project-st-gerards/ (intro)
ormondeconstruction.ie/education/ (card)
Project page and education card; no school statement.
C-072St. Teresian's School, Dublin 4: two-storey build, sports hall, brownfield site in a live school with phased handover.ormondeconstruction.ie/project-st-teresians/ (intro)Project prose only; no school statement or dated handover.
C-073Ormonde Construction took part in the Construction Industry Federation's International Women's Day event (7 March 2024) via a staff panel member.ormondeconstruction.ie/international-womens-day/ (article)Post says a staff member was on the panel at the previous year's event and announces the 7 March event; nothing shows Ormonde participated in the 7 March 2024 event itself.
Reviewer's note: The reviewer corrected the reading: the company's post says a staff member was on the panel at the previous year's event, and announces the 7 March 2024 event; the claim's date was the lister's.
C-074A staff quantity surveyor works at Ormonde, joined after working at a local Kilkenny firm, England and Dublin (podcast feature, July 2024).ormondeconstruction.ie/quality-in-quantity/ (Moving up)
ormondeconstruction.ie/lisa-oshea-leading-the-way/ (article)
Career steps are the article's own prose; the only independent artefact is a link to a third-party podcast episode, which is outside the audit's scope to fetch. Article dates are 14 July 2024 and 8 October 2024.
Reviewer's note: The podcast post is dated 8 October 2024; the July 2024 item is a profile article. The career facts are consistent across both; the date in the claim was the lister's.

Sources as fetched

Every verdict above points into one of these files. To check one, fetch the URL with a browser user-agent and run sha256sum on the bytes; a different fingerprint means the page changed after 2026-10-27.

SourceHTTPsha256 as fetched
https://ormondeconstruction.ie/200be13b80e05b4bf43ff0ae195c5f3a95698a1e14eee355bd9d172c6789f5d98c7
https://ormondeconstruction.ie/page-sitemap.xml2003aac6183658d9321fe3f6e54cc4cfc12908dd506a4adc1d28658fd0074bc4711
https://ormondeconstruction.ie/post-sitemap.xml2002d2d5c4ef82c03f4380bb036aea833c6905be4449bbfc6facd3f65d688cf77a1
https://ormondeconstruction.ie/robots.txt2000b4e7573951185bd2029913be1b21336c788d9fa0527e2a3f527c309e03a9814
https://ormondeconstruction.ie/our-team/200794035fe1260a619211d9df999030c6eb26b36e685e2407d7148284b0d59d915
https://ormondeconstruction.ie/project-one/200b628c4bc1e30a92e974f6a82fc56f0bb5b704c4f0b39af576a90f57e71a4353b
https://ormondeconstruction.ie/project-two/2002b2393ade494aa09334218c3f90a32b90362540de740935122cfedec1c5e731c
https://ormondeconstruction.ie/faq/2005e3bde0dfc1a76ab24a81efd5af2fea6e4324342667a5f13eba0f8fe89404a40
https://ormondeconstruction.ie/one-page/2009076de2e43ff1f9fca79c1d8c8c36423444080bdaa3b456cfbe9286dfa4df2a5
https://ormondeconstruction.ie/history/2005a3e96693351b690143ebd36523e736e0fdd4e20f16d0427070fbe61156c5f54
https://ormondeconstruction.ie/home/200490ef627d1ec77aa5380e4b7043c25483c70790a750ce168bf7d06a24e917df7
https://ormondeconstruction.ie/team-2/2003ac1572d3843748346a47fc4f58d5dd55187c31ed89c44eae05e7ddf0b7c0291
https://ormondeconstruction.ie/commercial/200f669e6097b6bbf0b9632bd7bf443f965c8f1a655bb804aedf19ed166943747db
https://ormondeconstruction.ie/contact/2008d576ffcb449fa2a30985873bc5ca295f818a4ccf5340054a53f18397c6df320
https://ormondeconstruction.ie/core-values/200e9da29f877edda39eb4f2860ad339a730781984e58590cd4585075613b2bde8c
https://ormondeconstruction.ie/education/20043d6d4ad8e53601fc535577a7fcd4152fa95e45c6bae97741836d715c1d3bc2a
https://ormondeconstruction.ie/industrial/2006c621e9236aca12f39ea8a3afe679dd6a5c3d1856ee0e79fc54633baa638fabb
https://ormondeconstruction.ie/john/2006c9108237d5975fa3764420f5ece9effd93c5007f219010c32a37afb653695e2
https://ormondeconstruction.ie/project-gowran-park/2007425ed85fad27507e8a39aa9ad17095aac053ae4d32abe94509919b1a1e8282d
https://ormondeconstruction.ie/project-ballykelly/2004a6cbddd5b975632d4e77134fde7d7de68d16e79cc868cff0c0031bd35002258
https://ormondeconstruction.ie/residential/2009de6ebf87e1809b02f21637d4dd6d3131fe14b8d4881291220233590b6cea1d3
https://ormondeconstruction.ie/upcoming-projects/200541ee3cf21ccabb085043852f12c36d8dee0e71d24274505968551a0a857c66b
https://ormondeconstruction.ie/project-adamstown/2003cdf423da912c92ae82f480cfb95bc644b6ee87ab3d1b5357dbfa19e7dd5ac6f
https://ormondeconstruction.ie/project-arus-brugha/2007706b0f7c23722335ad793732fd493b93cd12244a3b95229e35185acf69a770d
https://ormondeconstruction.ie/project-bergins/200d0e2c26e5c3ea05ee05e4eacc7bcc843b2850506acefa31f4ad888a5f8b05a52
https://ormondeconstruction.ie/project-callan-primary-care/200c4ea3a70fbb9ba74d659645331f938a2a37409c2d8d2994d35beb74a24f89215
https://ormondeconstruction.ie/project-castle-oaks/200d831b8f91678b10b749fd59fbacffc853906f0367b872daa54f17af3c594121a
https://ormondeconstruction.ie/project-college-park/2002eaa8b8ac4624465f46fd700d87a9e042b2e17220c92534b3a590c445a6ff58c
https://ormondeconstruction.ie/project-droughill/20059fdcc9c82a6cd252e977cd8796cbfcb70b9f8cd247a34befa941ce7df9631b7
https://ormondeconstruction.ie/project-kilkenny/200e90f6f317e18e4c4eb649575486025af2959facbe18078540a33b054c336a22e
https://ormondeconstruction.ie/project-market-square/200d7e7c44321a260aa635a58cd0f70316e022226881a3d7eca243f7f925c1286bb
https://ormondeconstruction.ie/project-meubles/200d52c9c7225b3db1a94b644c00ac9a5a3b026d55c185841dcc29bbcd5179b61ac
https://ormondeconstruction.ie/project-nowlan-park/2004041de639b658beb326085d4985a3256eac71a2135d391766db5317b36ef99de
https://ormondeconstruction.ie/project-powerscourt-distillery/200b1e8ffa48623d5d1201a26e4e8736b7d364b1eca5e9b8c0de90e2720a4875d54
https://ormondeconstruction.ie/project-prl/200f850b4955e9e70e7537c406e47319d6c2b586440011f46fb31dc8b7d8aeb6e48
https://ormondeconstruction.ie/project-st-gerards/2009a485790e3c6961d8cc1a5b7062a923aabf40cfa51aa31669e3d4b338403bb27
https://ormondeconstruction.ie/project-st-teresians/200e935a3117df2efd3e0b052710f04b0f14b39c7290f43896c81c6fb5f5979f75b
https://ormondeconstruction.ie/project-taxback/20003e0dacb0535e91bd72ac67a3a9ae82604a00b896fcfbf29d87e0d509cf3fe2c
https://ormondeconstruction.ie/project-thomastown-primary-care/200f4f93e274188d60e6a7a0967795636e2f6e0e72bcd17a1935d6b05efea2ebda2
https://ormondeconstruction.ie/project-walken-street/2004385f3a38128fa3fe5c8c62ac6902d7cd4c69d9dff4a94e8b4b973f4a19d4c1d
https://ormondeconstruction.ie/project-ballykelly-2/200ae09b06f56df2578a2957a8852cf83248c3b5fadec19aa656c7ac3e81a4d375c
https://ormondeconstruction.ie/sustainability/20018bfcb6d8805081c8d0cd5cfa6340abc58af465fb48cfa36165db6faafd71177
https://ormondeconstruction.ie/oc-news/20050739d8b8fc972f34a0ed952ffe764c26a95095610105d63e432c7743f0496dc
https://ormondeconstruction.ie/design/20049d46afb01127fb56819095c5b1765a4092fd1710550d52646d10ccd465ef179
https://ormondeconstruction.ie/about-company/2006e87a9abd144a32e8bf1d3b7bf0e2b67b1b540bb68528680af1bed2c2aed4e7b
https://ormondeconstruction.ie/team/200ade2f4fadc223b696f94970eb67b4ad3c3e9cb56d0ce3c6ca5f1758842c91906
https://ormondeconstruction.ie/healthandsafety/2008eb8e2c051ce402040b56d278ca57ae5f03711df7a55db455cef402bdb301338
https://ormondeconstruction.ie/healthcare/200fabef18138ef25a2f612d7db71e22c22370d06a1a94736bce91a996d76b8fc3c
https://ormondeconstruction.ie/richie/2009b106b66fe314a2302aadc172e7daeb122b9d4ec2cafc7a51ca4713dcb151478
https://ormondeconstruction.ie/paddy/20028d5debc8d42ccf7a405d6cb89401cdf2007e59db45dea47b9dce49d95ef00d6
https://ormondeconstruction.ie/project-crokers/20038b511d82ff6e10711d49c203c763a4d384b2fcc817bb69d97baeb8935560abf
https://ormondeconstruction.ie/projects/200a84f1a1defee6bc12a94a5c1e483c07c7b150601c9136286239b307b9ad6c1ae
https://ormondeconstruction.ie/news/200e0a05cddae9cf721465c04365c67f2f57477786c4662b7165a547378b7170329
https://ormondeconstruction.ie/new-social-and-affordable-housing-scheme-in-kilkenny/20051dcbf0cee932acc347955ecda16d76b03022154bb707a8c91353b6e4caaa4d8
https://ormondeconstruction.ie/international-womens-day/20082584087de36dc449be9672e6bf59e899bf5940b481f8f76edf585cff126ff89
https://ormondeconstruction.ie/green-light-for-large-new-primary-care-centre/200d6f2d4a8dc7dc4f3aa1bf19baa8e7213a86f154000992a33797b1be5cf3aefa3
https://ormondeconstruction.ie/lisa-oshea-leading-the-way/2009966423c544a4d88b096f77cea9cb72ef27b1da995dcf82914965199683d035d
https://ormondeconstruction.ie/gowran-park-handover/2005f1ffd1db9683056b882db9fae742fc30b24cc59c010e792c14db7ef59af13ba
https://ormondeconstruction.ie/quality-in-quantity/200325b7f6a24fecd92057b358ef3a0862a8c46f95bbbf444ee0eeae9ec1e73ae2f