> Every checkable claim ormondeconstruction.ie makes on its own public pages, where it is made, and what backs it: 5 evidenced, 3 contradicted, 67 with no evidence published, of 75. Checked 2026-10-27. Nothing here says true or false.

Canonical: https://onedroid.ai/evidence/ormondeconstruction.ie

Evidence pages

Evidence page · ormondeconstruction.ie · checked 2026-10-27

# Ormonde Construction Ltd: its public claims,
and the evidence behind them.

This page lists the checkable claims ormondeconstruction.ie makes on its own public pages,
where each claim is made, and what the company itself has published that backs it. It was checked on 2026-10-27
by OneDroid, a third party, from the company's own public sources only: 75 claims, 5 evidenced,
3 contradicted, 67 with no evidence published.
Nothing on this page says a claim is true or false. Every reference points into a source whose sha256 as fetched is
listed at the end of the page, so anyone can fetch the same bytes and compare. The same page as Markdown:
/evidence/ormondeconstruction.ie.md.

## How to read this page

Verdict | Meaning | Count |

EVIDENCED | an artefact on the company's own surfaces would be false if the claim were | 5 |

CONTRADICTED | the company's own surfaces disagree with the claim; both sides are referenced | 3 |

NO EVIDENCE PUBLISHED | the claim is stated; nothing beyond the statement backs it in the sources checked | 67 |

These are the only three verdicts. They are statements about the company's own published sources as fetched on
2026-10-27, not about the world. A claim with no evidence published may well be true; the page says only that
the company has not shown it. A contradicted claim may have a reading that reconciles the two sources; where the
reviewers saw one, the note says so. Each claim has an id (C-001, C-002, ...) that is also its anchor on this page.
The method and the rules for every page are on the evidence pages index.

### Limits

Same sources only: the reviewers read what the company published and nothing else. They did not test the product,
interview anyone or use outside records. Every verdict is about the sources as fetched on 2026-10-27; a page can
change after that. One run is a sample of a moving site: a claim not listed may be right or wrong. The reviewers are
AI agents run by OneDroid, checked by hand on a sample; OneDroid is not independent of its own method.

### Right of reply

If you are Ormonde Construction Ltd and a line is wrong, write to michal@onedroid.ai
naming the claim id. Your answer is shown beside the verdict, in full and unedited, with its date, and does not replace
the verdict. If you publish new evidence, the claim is checked again from the new sources, with a new date and new
fingerprints, and the verdict changes when the evidence supports it. A wrong quote, URL or fingerprint is corrected
on request and listed in the change log.

### Change log

2026-10-27: first run.

## Contradicted (3)

Id | Claim, as made | Made at | Both sides |

C-001 | Ormonde Construction Ltd has been in operation since 2001. | ormondeconstruction.ie/ (Welcome To Ormonde Construction)
ormondeconstruction.ie/home/ (Welcome To Ormonde Construction / Crokers Hill slide) | Home page says 'in operation since 2001' but the history timeline's company entry is headed '2002' with 'Ormonde Construction Ltd ... in operation for over 21 years'. Confidence low: 2002 can be read as a first-trading or incorporation marker rather than the founding year, so the pages may agree.
text/history.txt#L25-L27
text/home.txt#L58
text/index.txt#L49
Reviewer's note: Reconcilable reading: the history timeline's 2002 entry may mark first trading or incorporation rather than the founding year; the site does not say which. A one-year gap, on the company's own pages. |

C-002 | Ormonde Construction was established in 2001 (based in Kilkenny, in the South East). | ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/john/ (Managing Director bio page: set up Ormonde Construction Ltd in 2001) | About and the Managing Director bio both say 2001 (set up in 2001), while the history timeline dates the company entry 2002. Confidence low: the 2002 entry may mark a different event (e.g. first full year); the site never says which.
text/about-company.txt#L26
text/john.txt#L26
text/history.txt#L25-L27
Reviewer's note: Same disagreement as C-001: About and the Managing Director's page say 2001, the history timeline heads the company entry 2002. |

C-022 | Commercial Director has over 30 years' experience as a Quantity Surveyor and joined Ormonde in 2015. | ormondeconstruction.ie/paddy/ (Commercial Director bio page) | The bio page and /team/ give the title Commercial Director, but the live /team-2/ page gives the same person the title Commercial Manager. Confidence medium: /team-2/ may be an older duplicate page, but it is live at HTTP 200 and modified 2024-09-20.
text/paddy.txt#L26 ('Commercial Director ... joining Ormonde in 2015')
text/team.txt#L25-L26 ('Commercial Director')
text/team-2.txt#L25-L26 ('Commercial Manager') |

## Evidenced (5)

Id | Claim, as made | Made at | Artefact |

C-004 | History timeline dates the company entry at 2002 ('2002 Ormonde Construction Ltd'), while other pages say 2001. | ormondeconstruction.ie/history/ (timeline first entry) | text/history.txt#L25-L27
sources/history.html#L1061 (ue-title/ue-description of first timeline entry)
The history page itself is the fact: first timeline entry is numbered 2002 over the Ormonde Construction Ltd text, which would be false if the claim were false.
Reviewer's note: This row records the disagreement itself; the history page shows it (first timeline entry headed 2002, three other pages say 2001). The contradiction is scored on C-001 and C-002. |

C-008 | Tagline: 'Built on Experience'. | ormondeconstruction.ie/ (JSON-LD WebSite description / hero heading) | sources/index.html#L23 (JSON-LD WebSite description 'Built on Experience')
sources/index.html#L1291 (hero h3 'Built on Experience')
text/home.txt#L46
Machine-readable WebSite description and visible heading both carry the tagline; the claim is about what the site says so the page content is the fact. |

C-026 | The team page lists a Managing Director, Contracts Director, Commercial Director and Commercial Manager. | ormondeconstruction.ie/team-2/ (role titles)
ormondeconstruction.ie/team/ (Commercial Director) | text/team-2.txt#L25-L33
text/team.txt#L25-L33
https://ormondeconstruction.ie/team-2/#HTTP 200 (checks-for-prompt.md)
The team pages are the fact: team-2 lists the Commercial Manager title and team lists Commercial Director, alongside Managing Director and Contracts Director; PARTIAL in that the two pages differ on the third title.
Reviewer's note: The reviewer corrected the lister: each team page lists three roles, not four; the two live team pages differ on one title (Commercial Director on /team/, Commercial Manager on /team-2/), scored on C-022. |

C-058 | Thomastown social and affordable housing: 42 units on a 1.24 hectare site at Abbeyhill, Ladywell Street, for Kilkenny County Council under Housing for All; Ormonde appointed contractor; expected completion early 2026. | ormondeconstruction.ie/new-social-and-affordable-housing-scheme-in-kilkenny/ (article body) | sources/new-social-and-affordable-housing-scheme-in-kilkenny.html#L1031 (quoted statement attributed to the council's chief executive naming Ormonde)
text/new-social-and-affordable-housing-scheme-in-kilkenny.txt#L25-L33
sources/post-sitemap.xml#L50 (lastmod 2024-10-08T21:13:38+00:00)
PARTIAL: a dated news post carries a named-role client quotation welcoming Ormonde's appointment, which backs the appointment; the 42 units, 1.24 ha and early 2026 completion are only the article's own text, and the quote itself is unverified on a third-party surface. |

C-075 | Site robots.txt allows all crawlers and lists sitemap_index.xml. | ormondeconstruction.ie/robots.txt (whole file) | https://ormondeconstruction.ie/robots.txt#HTTP 200, live GET 2026-10-27; body 'User-agent: *', 'Disallow:', 'Sitemap: https://ormondeconstruction.ie/sitemap_index.xml'
sources/robots.txt#L3-L6
https://ormondeconstruction.ie/sitemap_index.xml#HTTP 200 content-type text/xml, live GET 2026-10-27
The robots.txt file is itself the fact (empty Disallow for all agents, sitemap line) and the sitemap index it names answers 200. |

## No evidence published (67)

Id | Claim, as made | Made at | What would close it |

C-003 | Ormonde Construction Ltd ... has been in operation for over 21 years. | ormondeconstruction.ie/history/ (2002 timeline entry (og:description)) | Rolling 'over 21 years' text on the history page and its meta description; no dated artefact beyond the sentence, and the live fetch timed out in the check run. |

C-005 | Ormonde Construction Ltd is based in the South East of Ireland. | ormondeconstruction.ie/ (Welcome To Ormonde Construction)
ormondeconstruction.ie/history/ (2002 entry) | Location statement repeated on two pages; no address-bearing artefact tying the claim beyond the sentences. |

C-006 | Registered/office address: Unit 20, Danville Business Park, Kilkenny, R95 K282; tel +353 (0) 56 778 6940; info@ormondeconstruction.ie. | ormondeconstruction.ie/ (footer Contact Details)
ormondeconstruction.ie/contact/ (Our Location) | Address, phone and email appear in the footer and contact page; no registry, Companies Office extract or map listing on the company's surfaces to back registered-office status. Live contact page changed since the saved copy per checks. |

C-007 | The company has a LinkedIn page (Ormonde Construction Limited). | ormondeconstruction.ie/ (JSON-LD Organization sameAs / footer link) | The site only links to a LinkedIn URL; existence of the page itself is on a third-party surface outside the audit. |

C-009 | The company has completed projects in both the public and private sector. | ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/history/ (2020 entry: accumulated extensive experience in both the public and private sector) | Statement of public and private sector work only; the 2020 client list it refers to is absent from the saved page. |

C-010 | Sectors served: Commercial/retail, Industrial, Primary/Nursing care, Educational and Residential, including Design and Build. | ormondeconstruction.ie/about-company/ (Public and Private Sector)
ormondeconstruction.ie/ (sector list: Commercial/Retail/Fitout, Healthcare, Residential, Industrial, Design and Build, Education) | Sector list on two pages; sector pages exist but list the company's own projects, not independent confirmation. |

C-011 | Sectors also include food and beverage, healthcare, sports and leisure. | ormondeconstruction.ie/quality-in-quantity/ (Moving up paragraph) | Sentence in a staff profile article; no project pages for food and beverage or sport/leisure beyond Nowlan Park's own page restating itself. |

C-012 | The diversity of projects and client base has been the key in the success of the company. | ormondeconstruction.ie/ (Welcome)
ormondeconstruction.ie/history/ (2002 entry) | Self-assessment statement repeated on two pages; a comparison with no data. |

C-013 | Ormonde achieves client objectives within their set financial budgets and timelines. | ormondeconstruction.ie/ (Built on Experience / Kilkenny Primary Care slide)
ormondeconstruction.ie/history/ (2006 entry) | Assertion repeated on homepage and history; no budget or programme data per project published. |

C-014 | The company has many repeat clients over the years. | ormondeconstruction.ie/history/ (2006 entry: 'our many repeat clients over the years') | One sentence on 'many repeat clients'; no named repeat-client list or contract dates shown. |

C-015 | In 2014 the company broadened its client base and type of projects to deliver across new sectors. | ormondeconstruction.ie/history/ (2014 entry) | One timeline sentence; no dated project pages from 2014 on the site to back the broadened client base. |

C-016 | The company 'successfully completed projects for the following clients among others' (client list, 2020 entry; names not present in extracted text). | ormondeconstruction.ie/history/ (2020 entry) | Dangling reference: the sentence says 'the following clients' but the list is not present in the saved page; would need the client names or logos. |

C-017 | Company uses local suppliers and sub-contractors and employs locally as much as possible. | ormondeconstruction.ie/ (More About Us) | Single paragraph on local sourcing; no supplier list or subcontract data published. |

C-018 | Localising the supply chain reduces shipping/storage, emissions and energy usage and supply chain costs. | ormondeconstruction.ie/ (More About Us) | Generic claim about localised supply chains with no figures or method. |

C-019 | The company has successfully completed over 200 projects (apartment blocks, housing schemes, nursing homes, schools, office blocks, large industrial and warehousing). | ormondeconstruction.ie/john/ (Managing Director bio page) | 'Over 200 projects' in a bio; the projects page shows 21 project cards and no project register or list of 200. |

C-020 | Managing Director has over 30 years' experience in the construction industry and previously worked for two of Ireland's largest construction companies. | ormondeconstruction.ie/john/ (Managing Director bio page) | Biography statement; no employment history or named prior employers published. |

C-021 | The Managing Director oversees every aspect of projects including procurement, hiring/managing project team and ensuring compliance with building and safety regulations. | ormondeconstruction.ie/john/ (Managing Director bio page) | Role description in a bio; no process documents or org chart. |

C-023 | The Commercial Director manages the Estimating Department in delivery of tender submissions and has negotiated several significant residential, commercial and primary care centre buildings. | ormondeconstruction.ie/paddy/ (bio) | Role description; the named building types correspond to project pages but nothing ties the individual to them. |

C-024 | Contracts Director has over 20 years' experience, is degree qualified in Civil and Transportation Engineering, joined in 2005 and was appointed Contracts Director in 2017. | ormondeconstruction.ie/richie/ (Contracts Director bio page) | Biography statement; no degree certificate or membership listing shown. |

C-025 | Contracts Director is responsible for all site management teams and project delivery compliant with Building and HSEQ requirements. | ormondeconstruction.ie/richie/ (bio) | Responsibility statement in a bio; no HSEQ system document or certificate. |

C-027 | A quantity surveyor's duties include ensuring compliance with the Building Control Amendment Regulations (BCAR). | ormondeconstruction.ie/quality-in-quantity/ (Responsibilities) | Duty list in a staff profile article; no compliance document or BCAR assignment certificate. |

C-028 | Ormonde manages every aspect of commercial projects from pre-construction through to completion. | ormondeconstruction.ie/commercial/ (Commercial / Retail) | Capability statement; no scope document or case study with pre-construction phases. |

C-029 | Ormonde delivers fitout projects and operates 'at scale'. | ormondeconstruction.ie/commercial/ (Fitout) | Marketing wording ('operate at scale') with no metrics; no fitout project page is named. |

C-030 | Design-build delivery: the company finds it often translates to shorter schedules and lower project costs. | ormondeconstruction.ie/design/ (Design and Build) | Self-reported tendency with no schedule or cost comparison data. |

C-031 | Ormonde provides design and build services. | ormondeconstruction.ie/design/ (Design and Build)
ormondeconstruction.ie/ (sector list) | Design and Build sector page and project cards (Market Square, Droughill) restate the capability; no design-build contract or client confirmation. |

C-032 | Ormonde provides healthcare/primary care facilities with 'highly qualified teams'; healthcare is a key market. | ormondeconstruction.ie/healthcare/ (Healthcare) | Sector page statement; primary care project pages restate it but no HSE contract document or client statement. |

C-033 | Ormonde provides education facilities, including work in live school environments. | ormondeconstruction.ie/education/ (Education)
ormondeconstruction.ie/project-st-gerards/ (live school environment)
ormondeconstruction.ie/project-st-teresians/ (live school environment) | Education page and two project pages restate live-school working; no school or client statement. |

C-034 | Ormonde provides industrial project services including programme management and cost analysis. | ormondeconstruction.ie/industrial/ (Industrial) | Sector page statement; no programme or cost analysis sample published. |

C-035 | Ormonde provides residential services: project managing large social housing programmes, scheme design and placemaking; development team initiating new schemes. | ormondeconstruction.ie/residential/ (Residential) | Sector statement; no named social housing programme page apart from a news article on Thomastown housing. |

C-036 | Residential clients can be assured the finished result is delivered on time and budget and to the highest quality (reliable accommodation models). | ormondeconstruction.ie/residential/ (second paragraph) | Assurance wording with no delivered-on-time or budget data. |

C-037 | Health and safety: tool box talks, safety inductions, training and daily whiteboard meetings are used on projects. | ormondeconstruction.ie/healthandsafety/ (Health and Safety)
ormondeconstruction.ie/about-company/ (Health & Safety) | H&S page lists the practices; about page only says safety is at the heart, so the named practices appear on one page only. No safety statement document, inspection record or certificate. |

C-038 | All sites are regularly inspected by the company's H&S team for compliance with company procedures and legislative requirements. | ormondeconstruction.ie/healthandsafety/ (Health and Safety) | Inspection claim stated once; no inspection records or audit certificate. |

C-039 | Health & safety is at the heart of everything the company does; safety standards are constantly evaluated. | ormondeconstruction.ie/about-company/ (Health & Safety) | Aspirational wording with no metric or certification. |

C-040 | Committed to providing the necessary resources to eliminate injury and incidents on all projects. | ormondeconstruction.ie/healthandsafety/ (Health and Safety) | Commitment wording with no incident statistics or certification (e.g. no named safety certificate image). |

C-041 | Core objective: every individual working on Ormonde sites returns home safely and leaves with a sense of wellbeing. | ormondeconstruction.ie/project-thomastown-primary-care/ (core values sentence) | Values sentence on a project page; no policy document. |

C-042 | Quality objectives and control processes are defined and implemented; each project has a risk management plan (identify, prioritise, contingency, revisit and revise). | ormondeconstruction.ie/about-company/ (True Quality) | Quality and risk process described in prose; no manual, certification or sample risk plan published. |

C-043 | The company uses the latest software to track changes in a live environment so all parties work on the same consolidated information; CAD is used in design. | ormondeconstruction.ie/about-company/ (Technology) | Generic technology statement; the software is not named and no artefact shows its use. |

C-044 | Sustainability statement commitments: comply fully with legal requirements, assess environmental impacts and seek to reduce pollution, promote environmental and energy awareness through employee training, work with customers on sensitive choices, monitor progress, communicate policy to stakeholders. | ormondeconstruction.ie/sustainability/ (Sustainability Statement) | Policy bullets on one page; the Learn More buttons link to '#' so no policy document, plan or certification is available. |

C-045 | Crokers Hill project used eco-friendly materials (recycled or locally sourced), recycling/reuse of construction debris, and regular inspections and training on health and safety. | ormondeconstruction.ie/project-crokers/ (body) | Project page prose only; no materials schedule, waste records or certification. |

C-046 | Crokers Hill: over 88 housing units. | ormondeconstruction.ie/project-crokers/ (intro)
ormondeconstruction.ie/projects/ (Crokers Hill card) | Count stated on project page and card; no unit schedule or planning reference.
Reviewer's note: The project page says 'over 88 housing units' and the residential sector card for the same scheme says 'over 70'. Both are lower bounds, so they can be read to agree; one figure would be better. No unit count beyond the statements is published. |

C-047 | A residential project is described as 'over 70 housing units' (listing on residential page; project not named in extracted text). | ormondeconstruction.ie/residential/ (project card) | Count appears only as a card sentence; project name is not in the text beyond the card heading and no unit list.
Reviewer's note: The 'over 70 housing units' card is the Crokers Hill scheme; see C-046. |

C-048 | College Park, Callan Road, Kilkenny City: 59 residential units (timber frame, 3 and 4-bed semi-detached and terraced, duplexes, apartments). | ormondeconstruction.ie/project-college-park/ (intro)
ormondeconstruction.ie/projects/ (College Park card) | Unit count and construction type on project page and card; no drawings, planning number or client statement. |

C-049 | Castle Oaks: phased development of 77 mixed-tenure residential homes; Breagagh River site constraints; ESB overhead wires rerouted underground. | ormondeconstruction.ie/project-castle-oaks/ (intro) | Project prose only; no phasing programme, utilities correspondence or client statement. |

C-050 | Castle Oaks next phase launching (upcoming). | ormondeconstruction.ie/upcoming-projects/ (Castle Oaks Housing) | Single line on the upcoming page; no planning reference or dated announcement. |

C-051 | Droughill Housing: 26 new residences (18 two-storey terraced and 8 single-storey semi-detached), 90 to 100 square metres each. | ormondeconstruction.ie/project-droughill/ (intro)
ormondeconstruction.ie/design/ (Droughill card) | Counts and sizes on project page and card; no unit schedule or drawings. |

C-052 | Market Square (Vignoles Gardens): Design and Build contract for 20 elderly houses and apartments incl. renovation of a derelict Protected Structure. | ormondeconstruction.ie/project-market-square/ (intro)
ormondeconstruction.ie/design/ (card) | Design and Build project prose; no contract or client statement; the Protected Structure is not tied to a protected-structure register entry on the site. |

C-053 | Walkin Street, Kilkenny City: 27 apartments, community centre, offices, underground car park, 3800m2 floor area, 4-storey over basement. | ormondeconstruction.ie/project-walken-street/ (intro)
ormondeconstruction.ie/ (Latest Projects) | Project page and homepage card; no drawings or client confirmation. |

C-054 | Walkin Street development is 'award winning' (award not named). | ormondeconstruction.ie/project-walken-street/ (first sentence) | Single adjective 'award winning' with no award, body, year or certificate named or shown. |

C-055 | Kilkenny Primary Care: three-storey Primary Health Care centre, 5867m2 floor area, NZEB compliant, turnkey with furniture and fittings. | ormondeconstruction.ie/project-kilkenny/ (intro and Security) | Floor area and NZEB compliance stated in prose only; no BER, NZEB certificate or client statement. |

C-056 | Thomastown Primary Care Centre: commissioned by the HSE, 3500 square metres, two-storey, Ladys Well St., Thomastown. | ormondeconstruction.ie/project-thomastown-primary-care/ (intro)
ormondeconstruction.ie/ (Latest Projects) | HSE commissioning and size stated on the company's pages; no HSE document or tender award linked. |

C-057 | Callan Primary Care: Primary Care Centre and Neighbour Centre in Westcourt, Callan, with 3,000 sq ft GP surgery, fit-out to HSE standards. | ormondeconstruction.ie/project-callan-primary-care/ (intro) | Project prose only; no HSE fit-out sign-off or client statement. |

C-059 | Planning permission granted by Kilkenny County Council for a new primary care centre on Hebron Road, Kilkenny (89 parking spaces); Hebron Road Primary Care Centre and Housing is listed as upcoming. | ormondeconstruction.ie/green-light-for-large-new-primary-care-centre/ (article body)
ormondeconstruction.ie/upcoming-projects/ (list) | News post and upcoming list restate it; no planning reference or council notice linked (council notices are outside this audit). |

C-060 | Upcoming projects: Fethard Primary Care Centre, Thurles Housing, Williamstown Housing, Tullamore Warehouse 12, Thomastown Housing, Hebron Road Primary Care Centre and Housing. | ormondeconstruction.ie/upcoming-projects/ (list) | Bare list of project names with no dates, clients or planning references.
Reviewer's note: The upcoming-projects list (modified 2025-09-19) still names Thomastown Housing while the company's news item of 8 October 2024 says construction there has started. Read as a stale list rather than a contradiction; the page does not say. |

C-061 | Adamstown community centre: SDZ project, 15 months from planning submission to handover; built in a seven-month programme within budget; Ormonde managed precast works on a design and build basis. | ormondeconstruction.ie/project-adamstown/ (Streamline) | Programme durations in project prose; no dated milestones, budget or client statement. |

C-062 | Aras Brugha Hostel, Dungarvan: refurbishment, three-storey extension, M&E works; completed March 2019. | ormondeconstruction.ie/project-arus-brugha/ (intro and Safety) | Completion date stated in prose only; no dated handover document or client statement. |

C-063 | Bergins: 50,000 ft2 warehouse for Bergin Haulage at Purcellsinch Business Park, Kilkenny; 11m clear height; 8m high retaining walls. | ormondeconstruction.ie/project-bergins/ (intro) | Dimensions and client named in prose; no drawings or client statement. |

C-064 | Meubles: 100,000 sq ft retail showroom over two floors at Smithland's Retail Park, Kilkenny, built while the park stayed operational. | ormondeconstruction.ie/project-meubles/ (intro) | Size and live-site working in prose; no drawings or client statement. |

C-065 | PRL Logistics Solutions: 30,000 sq ft high-bay warehouse built within a live bonded site. | ormondeconstruction.ie/project-prl/ (intro)
ormondeconstruction.ie/industrial/ (PRL card) | Project page and industrial card restate it; no client statement. |

C-066 | Nowlan Park (UPMC Nowlan Park, Kilkenny GAA): new 4,000 all-seated covered stand, roof for Ardan Breathneach, County Board offices refurbishment; stadium fully operational during works. | ormondeconstruction.ie/project-nowlan-park/ (intro)
ormondeconstruction.ie/industrial/ (card) | Project prose only; no GAA or county board statement or dated handover. |

C-067 | Gowran Park racecourse (15 minutes from Kilkenny city): demolition of jockeys' weights room and new two-storey weight room building; limestone cladding; handover reported 8 October 2024. | ormondeconstruction.ie/project-gowran-park/ (intro)
ormondeconstruction.ie/gowran-park-handover/ (article) | Article text restates the project page; the 8 October 2024 date is only the post's CMS publication metadata, not evidence of when handover occurred. |

C-068 | Taxback: renovation of a three-storey 20,000 sq ft office block, delivered with a five-month completion deadline. | ormondeconstruction.ie/project-taxback/ (intro and Minimising) | Size and deadline in project prose; no dated handover or client statement. |

C-069 | Powerscourt Distillery and Visitors Centre, Enniskerry, Co. Wicklow: Ormonde was Main Contractor; new 15m distillery building; restoration of 1730 mill house (protected structure). | ormondeconstruction.ie/project-powerscourt-distillery/ (intro and Renovation) | Main contractor role and building details in prose; no client statement or protected structure record linked. |

C-070 | Church of Oak Distillery (Ballykelly Distillery) near Monasterevin, Co. Kildare: demolition, asbestos removal, site works. | ormondeconstruction.ie/project-ballykelly-2/ (intro)
ormondeconstruction.ie/ (Latest Projects) | Project page and homepage card; no client statement. |

C-071 | St. Gerard's Private School, Bray, Co. Wicklow: extension to Junior and Senior schools, fire remediation, all work in a live school with phased handover. | ormondeconstruction.ie/project-st-gerards/ (intro)
ormondeconstruction.ie/education/ (card) | Project page and education card; no school statement. |

C-072 | St. Teresian's School, Dublin 4: two-storey build, sports hall, brownfield site in a live school with phased handover. | ormondeconstruction.ie/project-st-teresians/ (intro) | Project prose only; no school statement or dated handover. |

C-073 | Ormonde Construction took part in the Construction Industry Federation's International Women's Day event (7 March 2024) via a staff panel member. | ormondeconstruction.ie/international-womens-day/ (article) | Post says a staff member was on the panel at the previous year's event and announces the 7 March event; nothing shows Ormonde participated in the 7 March 2024 event itself.
Reviewer's note: The reviewer corrected the reading: the company's post says a staff member was on the panel at the previous year's event, and announces the 7 March 2024 event; the claim's date was the lister's. |

C-074 | A staff quantity surveyor works at Ormonde, joined after working at a local Kilkenny firm, England and Dublin (podcast feature, July 2024). | ormondeconstruction.ie/quality-in-quantity/ (Moving up)
ormondeconstruction.ie/lisa-oshea-leading-the-way/ (article) | Career steps are the article's own prose; the only independent artefact is a link to a third-party podcast episode, which is outside the audit's scope to fetch. Article dates are 14 July 2024 and 8 October 2024.
Reviewer's note: The podcast post is dated 8 October 2024; the July 2024 item is a profile article. The career facts are consistent across both; the date in the claim was the lister's. |

## Sources as fetched

Every verdict above points into one of these files. To check one, fetch the URL with a browser user-agent and run
sha256sum on the bytes; a different fingerprint means the page changed after 2026-10-27.

Source | HTTP | sha256 as fetched |

https://ormondeconstruction.ie/ | 200 | `be13b80e05b4bf43ff0ae195c5f3a95698a1e14eee355bd9d172c6789f5d98c7` |

https://ormondeconstruction.ie/page-sitemap.xml | 200 | `3aac6183658d9321fe3f6e54cc4cfc12908dd506a4adc1d28658fd0074bc4711` |

https://ormondeconstruction.ie/post-sitemap.xml | 200 | `2d2d5c4ef82c03f4380bb036aea833c6905be4449bbfc6facd3f65d688cf77a1` |

https://ormondeconstruction.ie/robots.txt | 200 | `0b4e7573951185bd2029913be1b21336c788d9fa0527e2a3f527c309e03a9814` |

https://ormondeconstruction.ie/our-team/ | 200 | `794035fe1260a619211d9df999030c6eb26b36e685e2407d7148284b0d59d915` |

https://ormondeconstruction.ie/project-one/ | 200 | `b628c4bc1e30a92e974f6a82fc56f0bb5b704c4f0b39af576a90f57e71a4353b` |

https://ormondeconstruction.ie/project-two/ | 200 | `2b2393ade494aa09334218c3f90a32b90362540de740935122cfedec1c5e731c` |

https://ormondeconstruction.ie/faq/ | 200 | `5e3bde0dfc1a76ab24a81efd5af2fea6e4324342667a5f13eba0f8fe89404a40` |

https://ormondeconstruction.ie/one-page/ | 200 | `9076de2e43ff1f9fca79c1d8c8c36423444080bdaa3b456cfbe9286dfa4df2a5` |

https://ormondeconstruction.ie/history/ | 200 | `5a3e96693351b690143ebd36523e736e0fdd4e20f16d0427070fbe61156c5f54` |

https://ormondeconstruction.ie/home/ | 200 | `490ef627d1ec77aa5380e4b7043c25483c70790a750ce168bf7d06a24e917df7` |

https://ormondeconstruction.ie/team-2/ | 200 | `3ac1572d3843748346a47fc4f58d5dd55187c31ed89c44eae05e7ddf0b7c0291` |

https://ormondeconstruction.ie/commercial/ | 200 | `f669e6097b6bbf0b9632bd7bf443f965c8f1a655bb804aedf19ed166943747db` |

https://ormondeconstruction.ie/contact/ | 200 | `8d576ffcb449fa2a30985873bc5ca295f818a4ccf5340054a53f18397c6df320` |

https://ormondeconstruction.ie/core-values/ | 200 | `e9da29f877edda39eb4f2860ad339a730781984e58590cd4585075613b2bde8c` |

https://ormondeconstruction.ie/education/ | 200 | `43d6d4ad8e53601fc535577a7fcd4152fa95e45c6bae97741836d715c1d3bc2a` |

https://ormondeconstruction.ie/industrial/ | 200 | `6c621e9236aca12f39ea8a3afe679dd6a5c3d1856ee0e79fc54633baa638fabb` |

https://ormondeconstruction.ie/john/ | 200 | `6c9108237d5975fa3764420f5ece9effd93c5007f219010c32a37afb653695e2` |

https://ormondeconstruction.ie/project-gowran-park/ | 200 | `7425ed85fad27507e8a39aa9ad17095aac053ae4d32abe94509919b1a1e8282d` |

https://ormondeconstruction.ie/project-ballykelly/ | 200 | `4a6cbddd5b975632d4e77134fde7d7de68d16e79cc868cff0c0031bd35002258` |

https://ormondeconstruction.ie/residential/ | 200 | `9de6ebf87e1809b02f21637d4dd6d3131fe14b8d4881291220233590b6cea1d3` |

https://ormondeconstruction.ie/upcoming-projects/ | 200 | `541ee3cf21ccabb085043852f12c36d8dee0e71d24274505968551a0a857c66b` |

https://ormondeconstruction.ie/project-adamstown/ | 200 | `3cdf423da912c92ae82f480cfb95bc644b6ee87ab3d1b5357dbfa19e7dd5ac6f` |

https://ormondeconstruction.ie/project-arus-brugha/ | 200 | `7706b0f7c23722335ad793732fd493b93cd12244a3b95229e35185acf69a770d` |

https://ormondeconstruction.ie/project-bergins/ | 200 | `d0e2c26e5c3ea05ee05e4eacc7bcc843b2850506acefa31f4ad888a5f8b05a52` |

https://ormondeconstruction.ie/project-callan-primary-care/ | 200 | `c4ea3a70fbb9ba74d659645331f938a2a37409c2d8d2994d35beb74a24f89215` |

https://ormondeconstruction.ie/project-castle-oaks/ | 200 | `d831b8f91678b10b749fd59fbacffc853906f0367b872daa54f17af3c594121a` |

https://ormondeconstruction.ie/project-college-park/ | 200 | `2eaa8b8ac4624465f46fd700d87a9e042b2e17220c92534b3a590c445a6ff58c` |

https://ormondeconstruction.ie/project-droughill/ | 200 | `59fdcc9c82a6cd252e977cd8796cbfcb70b9f8cd247a34befa941ce7df9631b7` |

https://ormondeconstruction.ie/project-kilkenny/ | 200 | `e90f6f317e18e4c4eb649575486025af2959facbe18078540a33b054c336a22e` |

https://ormondeconstruction.ie/project-market-square/ | 200 | `d7e7c44321a260aa635a58cd0f70316e022226881a3d7eca243f7f925c1286bb` |

https://ormondeconstruction.ie/project-meubles/ | 200 | `d52c9c7225b3db1a94b644c00ac9a5a3b026d55c185841dcc29bbcd5179b61ac` |

https://ormondeconstruction.ie/project-nowlan-park/ | 200 | `4041de639b658beb326085d4985a3256eac71a2135d391766db5317b36ef99de` |

https://ormondeconstruction.ie/project-powerscourt-distillery/ | 200 | `b1e8ffa48623d5d1201a26e4e8736b7d364b1eca5e9b8c0de90e2720a4875d54` |

https://ormondeconstruction.ie/project-prl/ | 200 | `f850b4955e9e70e7537c406e47319d6c2b586440011f46fb31dc8b7d8aeb6e48` |

https://ormondeconstruction.ie/project-st-gerards/ | 200 | `9a485790e3c6961d8cc1a5b7062a923aabf40cfa51aa31669e3d4b338403bb27` |

https://ormondeconstruction.ie/project-st-teresians/ | 200 | `e935a3117df2efd3e0b052710f04b0f14b39c7290f43896c81c6fb5f5979f75b` |

https://ormondeconstruction.ie/project-taxback/ | 200 | `03e0dacb0535e91bd72ac67a3a9ae82604a00b896fcfbf29d87e0d509cf3fe2c` |

https://ormondeconstruction.ie/project-thomastown-primary-care/ | 200 | `f4f93e274188d60e6a7a0967795636e2f6e0e72bcd17a1935d6b05efea2ebda2` |

https://ormondeconstruction.ie/project-walken-street/ | 200 | `4385f3a38128fa3fe5c8c62ac6902d7cd4c69d9dff4a94e8b4b973f4a19d4c1d` |

https://ormondeconstruction.ie/project-ballykelly-2/ | 200 | `ae09b06f56df2578a2957a8852cf83248c3b5fadec19aa656c7ac3e81a4d375c` |

https://ormondeconstruction.ie/sustainability/ | 200 | `18bfcb6d8805081c8d0cd5cfa6340abc58af465fb48cfa36165db6faafd71177` |

https://ormondeconstruction.ie/oc-news/ | 200 | `50739d8b8fc972f34a0ed952ffe764c26a95095610105d63e432c7743f0496dc` |

https://ormondeconstruction.ie/design/ | 200 | `49d46afb01127fb56819095c5b1765a4092fd1710550d52646d10ccd465ef179` |

https://ormondeconstruction.ie/about-company/ | 200 | `6e87a9abd144a32e8bf1d3b7bf0e2b67b1b540bb68528680af1bed2c2aed4e7b` |

https://ormondeconstruction.ie/team/ | 200 | `ade2f4fadc223b696f94970eb67b4ad3c3e9cb56d0ce3c6ca5f1758842c91906` |

https://ormondeconstruction.ie/healthandsafety/ | 200 | `8eb8e2c051ce402040b56d278ca57ae5f03711df7a55db455cef402bdb301338` |

https://ormondeconstruction.ie/healthcare/ | 200 | `fabef18138ef25a2f612d7db71e22c22370d06a1a94736bce91a996d76b8fc3c` |

https://ormondeconstruction.ie/richie/ | 200 | `9b106b66fe314a2302aadc172e7daeb122b9d4ec2cafc7a51ca4713dcb151478` |

https://ormondeconstruction.ie/paddy/ | 200 | `28d5debc8d42ccf7a405d6cb89401cdf2007e59db45dea47b9dce49d95ef00d6` |

https://ormondeconstruction.ie/project-crokers/ | 200 | `38b511d82ff6e10711d49c203c763a4d384b2fcc817bb69d97baeb8935560abf` |

https://ormondeconstruction.ie/projects/ | 200 | `a84f1a1defee6bc12a94a5c1e483c07c7b150601c9136286239b307b9ad6c1ae` |

https://ormondeconstruction.ie/news/ | 200 | `e0a05cddae9cf721465c04365c67f2f57477786c4662b7165a547378b7170329` |

https://ormondeconstruction.ie/new-social-and-affordable-housing-scheme-in-kilkenny/ | 200 | `51dcbf0cee932acc347955ecda16d76b03022154bb707a8c91353b6e4caaa4d8` |

https://ormondeconstruction.ie/international-womens-day/ | 200 | `82584087de36dc449be9672e6bf59e899bf5940b481f8f76edf585cff126ff89` |

https://ormondeconstruction.ie/green-light-for-large-new-primary-care-centre/ | 200 | `d6f2d4a8dc7dc4f3aa1bf19baa8e7213a86f154000992a33797b1be5cf3aefa3` |

https://ormondeconstruction.ie/lisa-oshea-leading-the-way/ | 200 | `9966423c544a4d88b096f77cea9cb72ef27b1da995dcf82914965199683d035d` |

https://ormondeconstruction.ie/gowran-park-handover/ | 200 | `5f1ffd1db9683056b882db9fae742fc30b24cc59c010e792c14db7ef59af13ba` |

https://ormondeconstruction.ie/quality-in-quantity/ | 200 | `325b7f6a24fecd92057b358ef3a0862a8c46f95bbbf444ee0eeae9ec1e73ae2f` |